Hello all.
I'm posting the build thread of Fei-Bao's new F-14d prototype
enjoy.
Reinforcement of the rear stab support former..
Hello all.
I'm posting the build thread of Fei-Bao's new F-14d prototype
enjoy.
Reinforcement of the rear stab support former..
More ..
Inspection of former to fuselage glue joints.
יש איזה תמונה ZOOM OUT של המטוס?
"If everything seems under control, you're not going fast enough" Mario Andretti
More ...
Fuel tank preparation..
more...
Fuel system consists of three fuel tanks for ecah engine of
one 2.5 lt ,one 1.75 lt and a small hoper tank for each engine
This will allow for an estimated flight time of ~9 minutes
Next are the engines sub systems shelves installation which include ECU, Fuel pumps , fuel valves ,and fuel filters
More in the pics is visible the wings screw jack which when turning is driving the wings from fully extended to fully rewarded possition.
preparation of the bypass and tail pipe matching + painting the bypass inner surface with BV's "heat shield" a water based ceramic paint.
first steps of engine possitioning ...
also inlet trim and centering of the engine exhaust in the tail pipe
More....
Rudder servo... + twin stabilizer servo arrangement
It is evident from the pictuers that the entire area of the engine and exhaust bay have been treated with BV's Heat Shield protective paint.
That's all for now
Here is a picture of it in all...
אני מניח שהתשובה תהא "לא" אך אשאל בכל זאת, האם הכנף משתנה גאומטרית?
שי
Futaba 10CHP
Outrage Velocity 50, YS 56-SR
אני לא סובל מאי שפיות, אני נהנה ממנה.
Yes....
Center of gravity shifts during the transsition of the wing movement but so does the Mean Aerodynamic Cord possition relative to the fuse and with it the A/C further than that the wings pitch attitude changes too ( while folding back they pivot upwards by a few degrees) with all these changes the resault is that no pitch trim is required.
Next it's time to deal with the ventral fins installation this was done by inserting threaded inserts into the fin base with the aid of a few drops of structural glue.
אחי אתה פשוט מדהים באמת איזו השקעה אין דברים כאלה
אתה אלוף!!!
TreX 500 ESP
Blade MSR
DX7
חבורת ברנר לנצח
Preparation of equipment trays including paint finish + positioning in the front section of the fuselage
Preparation of Weatronic 2.4 Dual FHSS receiver mounting tray...
Some of the air tubing installation...
Pic's